Black Friday Deals Are Here: Up to 80% Off

Free Ground Shipping Over $199 Details

SKU: WBS504  |  Barcode: 000346678772

Bosch WBS504 3-1/2" Knotted Stainless Steel Wire Cup Brush for Small Angle Grinders

$19.92 $36.88

POWERED BY

We've got you covered.

Package Protection gives you peace of mind while saving you time and money.

  • Package Protection

    Coverage in case your package is damaged in transit, stolen, or doesn't arrive.

  • Instant Issue Resolution

    Get a refund or replacement in just a few clicks.

  • 24/7 Claim Support

    Route is here for you whenever an issue arises — with an average response time of under an hour.

Description

Bosch WBS504 Description

This Bosch 3-1/2 in. knotted stainless steel wire cup brush is built for common surface-prep tasks with small angle grinders. It helps remove weld scale, burrs, corrosion, rust, and paint while preparing metal surfaces for coating or finishing.

Bosch WBS504 Includes

  • (1) 3-1/2 in. Knotted Stainless Steel Wire Cup Brush

Bosch WBS504 Features

  • Knotted stainless steel bristles for aggressive surface preparation
  • Corrosion-resistant construction for demanding metalworking applications
  • Standard 5/8 in.-11 arbor fits many small angle grinders
  • Balanced for operation up to 12,500 RPM
  • Removes weld scale, burrs, corrosion, rust, and paint
  • Helps prepare metal surfaces for painting and finishing
  • Built for durability and control during high-speed brushing

Bosch WBS504 Specifications

Diameter 3-1/2 in.
Arbor 5/8"-11
Brush Type Knotted Cup Brush
Material Stainless Steel
Wire Diameter (in) 0.012
Wire Gauge (in) 0.02
Max. RPM 12,500
Compatible Tool Small angle grinder
Product Length (in) 4.47
Product Width (in) 3.54
Product Height (in) 2.32
Product Weight (lb) 0.86
Toolup Part # : 894550
WARNING: This product can expose you to chemicals, which are known to the State of California to cause cancer and birth defects or other reproductive harm. www.p65warnings.ca.gov

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Venmo
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

Bosch WBS504 3-1/2" Knotted Stainless Steel Wire Cup Brush for Small Angle Grinders
Bosch

Bosch WBS504 3-1/2" Knotted Stainless Steel Wire Cup Brush for Small Angle Grinders

$19.92 $36.88

Bosch WBS504 Description

This Bosch 3-1/2 in. knotted stainless steel wire cup brush is built for common surface-prep tasks with small angle grinders. It helps remove weld scale, burrs, corrosion, rust, and paint while preparing metal surfaces for coating or finishing.

Bosch WBS504 Includes

  • (1) 3-1/2 in. Knotted Stainless Steel Wire Cup Brush

Bosch WBS504 Features

  • Knotted stainless steel bristles for aggressive surface preparation
  • Corrosion-resistant construction for demanding metalworking applications
  • Standard 5/8 in.-11 arbor fits many small angle grinders
  • Balanced for operation up to 12,500 RPM
  • Removes weld scale, burrs, corrosion, rust, and paint
  • Helps prepare metal surfaces for painting and finishing
  • Built for durability and control during high-speed brushing

Bosch WBS504 Specifications

Diameter 3-1/2 in.
Arbor 5/8"-11
Brush Type Knotted Cup Brush
Material Stainless Steel
Wire Diameter (in) 0.012
Wire Gauge (in) 0.02
Max. RPM 12,500
Compatible Tool Small angle grinder
Product Length (in) 4.47
Product Width (in) 3.54
Product Height (in) 2.32
Product Weight (lb) 0.86
View product