Black Friday Deals Are Here: Up to 80% Off

Free Ground Shipping Over $199 Details

SKU: WBS509  |  Barcode: 000346678789

Bosch WBS509 3-1/2" Knotted Carbon Steel Cup Brush for Small Angle Grinders

$14.79 $27.39

POWERED BY

We've got you covered.

Package Protection gives you peace of mind while saving you time and money.

  • Package Protection

    Coverage in case your package is damaged in transit, stolen, or doesn't arrive.

  • Instant Issue Resolution

    Get a refund or replacement in just a few clicks.

  • 24/7 Claim Support

    Route is here for you whenever an issue arises — with an average response time of under an hour.

Description

Bosch WBS509 Description

Bosch's 3-1/2 in. knotted carbon steel cup brush is built for common surface-prep work with small angle grinders. It helps remove weld scale, burrs, and corrosion while preparing metal surfaces for paint, and it is rated for speeds up to 12,500 RPM.

Bosch WBS509 Includes

  • (1) 3-1/2 in. Knotted Carbon Steel Cup Brush

Bosch WBS509 Features

  • Made for use with small angle grinders
  • Knotted carbon steel wire delivers aggressive surface-prep performance
  • Removes weld scale, burrs, and corrosion
  • Helps prepare surfaces for paint application
  • Standard 5/8 in.-11 thread for broad grinder compatibility
  • Balanced for speeds up to 12,500 RPM
  • High-speed, low-vibration performance
  • Rugged tufted bristles provide durable cleaning action

Bosch WBS509 Specifications

Diameter 3-1/2 in.
Material Carbon steel
Arbor 5/8 in.-11
Brush Type Knotted cup brush
Wire Diameter (in) 0.02
Wire Gauge (in) 0.02
Max. RPM 12,500
Tool Small angle grinder
Product Length (in) 4.47
Product Width (in) 3.54
Product Height (in) 2.32
Product Weight (lb) 0.86
Toolup Part # : 894106
WARNING: This product can expose you to chemicals, which are known to the State of California to cause cancer and birth defects or other reproductive harm. www.p65warnings.ca.gov

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Venmo
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

Bosch WBS509 3-1/2" Knotted Carbon Steel Cup Brush for Small Angle Grinders
Bosch

Bosch WBS509 3-1/2" Knotted Carbon Steel Cup Brush for Small Angle Grinders

$14.79 $27.39

Bosch WBS509 Description

Bosch's 3-1/2 in. knotted carbon steel cup brush is built for common surface-prep work with small angle grinders. It helps remove weld scale, burrs, and corrosion while preparing metal surfaces for paint, and it is rated for speeds up to 12,500 RPM.

Bosch WBS509 Includes

  • (1) 3-1/2 in. Knotted Carbon Steel Cup Brush

Bosch WBS509 Features

  • Made for use with small angle grinders
  • Knotted carbon steel wire delivers aggressive surface-prep performance
  • Removes weld scale, burrs, and corrosion
  • Helps prepare surfaces for paint application
  • Standard 5/8 in.-11 thread for broad grinder compatibility
  • Balanced for speeds up to 12,500 RPM
  • High-speed, low-vibration performance
  • Rugged tufted bristles provide durable cleaning action

Bosch WBS509 Specifications

Diameter 3-1/2 in.
Material Carbon steel
Arbor 5/8 in.-11
Brush Type Knotted cup brush
Wire Diameter (in) 0.02
Wire Gauge (in) 0.02
Max. RPM 12,500
Tool Small angle grinder
Product Length (in) 4.47
Product Width (in) 3.54
Product Height (in) 2.32
Product Weight (lb) 0.86
View product