Black Friday Deals Are Here: Up to 80% Off

Free Ground Shipping Over $199 Details

SKU: WBS510  |  Barcode: 000346678796

Bosch WBS510 4" Knotted Carbon Steel Wire Cup Brush for Small Angle Grinders

$22.27 $41.24

POWERED BY

We've got you covered.

Package Protection gives you peace of mind while saving you time and money.

  • Package Protection

    Coverage in case your package is damaged in transit, stolen, or doesn't arrive.

  • Instant Issue Resolution

    Get a refund or replacement in just a few clicks.

  • 24/7 Claim Support

    Route is here for you whenever an issue arises — with an average response time of under an hour.

Description

Bosch WBS510 Description

Designed for small angle grinders, this Bosch 4 in. knotted carbon steel wire cup brush delivers durable, controlled surface-prep performance. It helps remove weld scale, burrs, and corrosion while preparing metal surfaces for paint application.

Bosch WBS510 Includes

  • (1) WBS510 4 in Knotted Carbon Steel Wire Cup Brush

Bosch WBS510 Features

  • Made for small angle grinders
  • Knotted carbon steel wire construction delivers aggressive surface prep
  • Removes weld scale, burrs, and corrosion
  • Helps prepare surfaces for paint application
  • Standard 5/8 in.-11 threaded arbor offers broad compatibility
  • Balanced design supports high speed, low vibration performance

Bosch WBS510 Specifications

Diameter 4 in.
Material Carbon steel
Arbor 5/8 in.-11
Brush Type Knotted Wire Cup Brush
Wire Diameter (in) 0.02
Wire Gauge (in) 0.02
Max. RPM 8,500
Tool Small angle grinder
Toolup Part # : 894576
WARNING: This product can expose you to chemicals, which are known to the State of California to cause cancer and birth defects or other reproductive harm. www.p65warnings.ca.gov

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Venmo
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

Bosch WBS510 4" Knotted Carbon Steel Wire Cup Brush for Small Angle Grinders
Bosch

Bosch WBS510 4" Knotted Carbon Steel Wire Cup Brush for Small Angle Grinders

$22.27 $41.24

Bosch WBS510 Description

Designed for small angle grinders, this Bosch 4 in. knotted carbon steel wire cup brush delivers durable, controlled surface-prep performance. It helps remove weld scale, burrs, and corrosion while preparing metal surfaces for paint application.

Bosch WBS510 Includes

  • (1) WBS510 4 in Knotted Carbon Steel Wire Cup Brush

Bosch WBS510 Features

  • Made for small angle grinders
  • Knotted carbon steel wire construction delivers aggressive surface prep
  • Removes weld scale, burrs, and corrosion
  • Helps prepare surfaces for paint application
  • Standard 5/8 in.-11 threaded arbor offers broad compatibility
  • Balanced design supports high speed, low vibration performance

Bosch WBS510 Specifications

Diameter 4 in.
Material Carbon steel
Arbor 5/8 in.-11
Brush Type Knotted Wire Cup Brush
Wire Diameter (in) 0.02
Wire Gauge (in) 0.02
Max. RPM 8,500
Tool Small angle grinder
View product