Black Friday Starts Early: Up to 80% Off Hundreds of Tools

Free Ground Shipping Over $199 Details

SKU: WBS511  |  Barcode: 000346678802

Bosch WBS511 6" Carbon Steel Knotted Wire Cup Brush for Angle Grinders

$52.83 $97.84

POWERED BY

We've got you covered.

Package Protection gives you peace of mind while saving you time and money.

  • Package Protection

    Coverage in case your package is damaged in transit, stolen, or doesn't arrive.

  • Instant Issue Resolution

    Get a refund or replacement in just a few clicks.

  • 24/7 Claim Support

    Route is here for you whenever an issue arises — with an average response time of under an hour.

Description

Bosch WBS511 Description

The Bosch 6 in. carbon steel knotted wire cup brush is built for small angle grinders and heavy-duty surface preparation. It features a standard 5/8"-11 arbor and a 6,600 RPM rating to help remove weld scale, burrs, and corrosion while preparing metal surfaces for paint and other finishing work.

Bosch WBS511 Includes

  • (1) WBS511 6 in. Knotted Wire Cup Brush

Bosch WBS511 Features

  • Made for small angle grinders
  • Knotted carbon steel wire construction for heavy-duty cleaning
  • Removes weld scale, burrs, and corrosion
  • Helps prepare surfaces for paint application
  • Standard 5/8"-11 thread for broad grinder compatibility
  • Balanced torque design rated for up to 6,600 RPM
  • 6 in. diameter provides wide cleaning coverage

Bosch WBS511 Specifications

Diameter 6 in.
Arbor 5/8"-11
Brush Type Knotted Wire Cup Brush
Material Carbon steel
Wire Diameter (in) 0.024
Wire Gauge (in) 0.024
Max. RPM 6,600
Tool Angle grinder
Toolup Part # : 894632
WARNING: This product can expose you to chemicals, which are known to the State of California to cause cancer and birth defects or other reproductive harm. www.p65warnings.ca.gov

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Venmo
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

Bosch WBS511 6" Carbon Steel Knotted Wire Cup Brush for Angle Grinders
Bosch

Bosch WBS511 6" Carbon Steel Knotted Wire Cup Brush for Angle Grinders

$52.83 $97.84

Bosch WBS511 Description

The Bosch 6 in. carbon steel knotted wire cup brush is built for small angle grinders and heavy-duty surface preparation. It features a standard 5/8"-11 arbor and a 6,600 RPM rating to help remove weld scale, burrs, and corrosion while preparing metal surfaces for paint and other finishing work.

Bosch WBS511 Includes

  • (1) WBS511 6 in. Knotted Wire Cup Brush

Bosch WBS511 Features

  • Made for small angle grinders
  • Knotted carbon steel wire construction for heavy-duty cleaning
  • Removes weld scale, burrs, and corrosion
  • Helps prepare surfaces for paint application
  • Standard 5/8"-11 thread for broad grinder compatibility
  • Balanced torque design rated for up to 6,600 RPM
  • 6 in. diameter provides wide cleaning coverage

Bosch WBS511 Specifications

Diameter 6 in.
Arbor 5/8"-11
Brush Type Knotted Wire Cup Brush
Material Carbon steel
Wire Diameter (in) 0.024
Wire Gauge (in) 0.024
Max. RPM 6,600
Tool Angle grinder
View product