Black Friday Deals Are Here: Up to 80% Off

Free Ground Shipping Over $199 Details

SKU: WBS524  |  Barcode: 000346678819

Bosch WBS524 3-1/2" Crimped Wire Cup Brush for Small Angle Grinders

$20.48 $37.92

POWERED BY

We've got you covered.

Package Protection gives you peace of mind while saving you time and money.

  • Package Protection

    Coverage in case your package is damaged in transit, stolen, or doesn't arrive.

  • Instant Issue Resolution

    Get a refund or replacement in just a few clicks.

  • 24/7 Claim Support

    Route is here for you whenever an issue arises — with an average response time of under an hour.

Description

Bosch WBS524 Description

The Bosch 3-1/2 in. crimped wire cup brush is built for small angle grinders and delivers reliable surface-prep performance. Its flexible carbon steel wire helps remove weld scale, burrs, and corrosion while preparing uneven surfaces for paint and finishing.

Bosch WBS524 Includes

  • (1) WBS524 3-1/2 in. Crimped Wire Cup Brush

Bosch WBS524 Features

  • Made for small angle grinders
  • Flexible crimped carbon steel wire conforms to irregular surfaces
  • Removes weld scale, burrs, and corrosion
  • Helps prepare surfaces for paint application
  • Balanced for up to 12,500 RPM
  • Standard 5/8 in.-11 thread fits many grinders
  • Delivers fast, controlled finishing

Bosch WBS524 Specifications

Brush Diameter 3-1/2 in.
Arbor 5/8 in.-11
Brush Type Crimped Wire Cup Brush
Material Carbon steel
Wire Diameter (in) 0.014
Wire Gauge (in) 0.014
Max. RPM 12,500
Compatible Tool Small angle grinder
Product Length (in) 4.47
Product Width (in) 3.54
Product Height (in) 2.32
Shipping Weight (lb) 0.77
Toolup Part # : 894742
WARNING: This product can expose you to chemicals, which are known to the State of California to cause cancer and birth defects or other reproductive harm. www.p65warnings.ca.gov

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Venmo
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

Bosch WBS524 3-1/2" Crimped Wire Cup Brush for Small Angle Grinders
Bosch

Bosch WBS524 3-1/2" Crimped Wire Cup Brush for Small Angle Grinders

$20.48 $37.92

Bosch WBS524 Description

The Bosch 3-1/2 in. crimped wire cup brush is built for small angle grinders and delivers reliable surface-prep performance. Its flexible carbon steel wire helps remove weld scale, burrs, and corrosion while preparing uneven surfaces for paint and finishing.

Bosch WBS524 Includes

  • (1) WBS524 3-1/2 in. Crimped Wire Cup Brush

Bosch WBS524 Features

  • Made for small angle grinders
  • Flexible crimped carbon steel wire conforms to irregular surfaces
  • Removes weld scale, burrs, and corrosion
  • Helps prepare surfaces for paint application
  • Balanced for up to 12,500 RPM
  • Standard 5/8 in.-11 thread fits many grinders
  • Delivers fast, controlled finishing

Bosch WBS524 Specifications

Brush Diameter 3-1/2 in.
Arbor 5/8 in.-11
Brush Type Crimped Wire Cup Brush
Material Carbon steel
Wire Diameter (in) 0.014
Wire Gauge (in) 0.014
Max. RPM 12,500
Compatible Tool Small angle grinder
Product Length (in) 4.47
Product Width (in) 3.54
Product Height (in) 2.32
Shipping Weight (lb) 0.77
View product